City of Dream 新濠天地
Four Season 四季
Galaxy 銀河
Grand Lisboa 新葡京
Parisian 巴黎人
Venetian 威尼斯人
Project Name 工程名稱 | Scope of work 內容 | Start 開始工期 | End 完成工期 |
---|---|---|---|
Sheraton Palms Lounge, Sands, Cotai | Main Contractor Scope: A&A and MEP works for existing Palm Lounge | May 2017 | Ongoing |
Venetian Mass Gaming Floor Refresh (Fit Out) | Main Contractor Scope: Fit-out works and refresh (celiings, floors, columns, marble paths, walls) for the entire gaming floor in the Great Hall (Approx 175,000 sq. ft.) | May 2017 | Ongoing |
Cotai Water Jet Macau Ticketing Counters (ABWF) at the new Taipa Ferry Terminal | Main Contractor Scope: ABWF for all Cotai Water Jet area such as Ticekting Counter, Baggage Check in, VIP lounge, arrival/departure halls | Mar 2017 | May 2017 |
Tissot - Macau Venetian Shop Renovation | Main Contractor Scope: Interior fitting out works & shop front, millworks, including full MEP scope | Mar 2017 | May 2017 |
Banyan Tree 2Bay Suite Room Refurbishment | Main Contractor Scope: Mock up and fit-out works | Feb 2017 | Ongoing |
Butani at Grand Lisboa | Main Contractor Scope: Structural modification works, Fit-out and MEP | Nov 2016 | Jan 2017 |
DFS Whitebox at Sands Four Seasons | Main Contractor Scope: ABWF and MEP works to modify existing shop into 2 shops | Oct 2016 | Nov 2016 |
Dish Washing Room Enhancement at Galaxy | Main Contractor Scope: Dishwashing Room Enhancement - Builder's and Drainage Work | Nov 2016 | Feb 2017 |
Golden Fish High limit Refresh - Venetian Macau | Main Contractor Scope: Golden Fish High limit Refresh - Demolition, MEP and Fitout of 31,000 sq ft | Jul 2016 | Feb 2017 |
Wynn Macau - 5/F Encore Office | Main Contractor Scope: 5/F Encore BOH office renovation including interior fitting out works, electrical and HVAC | Jul 2016 | Nov 2016 |
Wynn Macau Encore Tower - Wynn Macau | Main Contractor Scope: Encore tower roof structure rust removal and painting | Jul 2016 | Nov 2016 |
Rado - Parisian, Sands | Main Contractor Scope: interior fitting out works including full MEP scope | Jun 2016 | Sep 2016 |
Mido - Parisian, Sands | Main Contractor Scope: interior fitting out works including full MEP scope | Jun 2016 | Sep 2016 |
Calvin Klien Watches & Jewellry - Parisian, Sands | Main Contractor Scope: interior fitting out works including electrical works | Jun 2016 | Sep 2016 |
Hamilton - Parisian, Sands | Main Contractor Scope: interior fitting out works including electrical works | Jun 2016 | Sep 2016 |
Louis XIII – TV Wall and Counter Installation | Main Contractor Scope: interior fitting out works for TV wall and counters in Dispatch/Duty Engineering Center | Mar 2016 | Apr 2016 |
Studio City - 3F outdoor pool reburbishment works | Main Contractor Scope: outdoor refurbishment works around 3/F pool and to mens and womens restroooms | Mar 2016 | Apr 2016 |
Galaxy China Rouge | Main Contractor Scope: Enhancement works | Mar 2016 | Apr 2016 |
Galaxy Ritz Carlton GF, 1F, 2F, 51F & 53F | Main Contractor Scope: interior fitting out & related MEP works @ L51 Sky Bar; Enhancement works for GF, 1F, 2F, 51F & 53F | Feb 2016 | May 2016 |
Galaxy Phase 2 Cluster 1 Promenade | Main Contractor Scope: Enhancement works | Feb 2016 | Mar 2016 |
Wynn Palace – Richard Mille | Main Contractor Scope: interior fitting out works of 800+ sq ft including full MEP scope and coordination to other nominated | Nov 2015 | Jul 2016 |
Retail Corridor (ICBC) | Main Contractor Scope: Remodeling of existing retail corridor beside ICBC and MEP works | Oct 2015 | Nov 2015 |
JW Marriot & Ritz Carlton Transition Lobby | Main Contractor Scope: Re-fit out the transition lobby between JW Marriot Hotel & Ritz Carlton including all necessary MEP Works | Oct 2015 | Nov 2015 |
Hall 5 Restaurant, Kitchen & P1P2 Corridor Fit Out Works | MEP Contractor Scope: Improvement and of existing and installation of additional HVAC system and ventilation systems | Sep 2015 | Dec 2015 |
L2 Supporting Kitchen at Spa Block | MEP Contractor Scope: Improvement and of existing and installation of additional HVAC system and ventilation systems | Sep 2015 | Nov 2015 |
Wynn Encore Cooling Tower 永利冷水塔房 | Wynn Encore Cooling Tower Steel Beam Fire Proofing 永利冷水塔房工字鋼結構防火泥重做工程 | July 2015 | Aug 2015 |
Galaxy Mass Gaming Area Cage, Hall 1, 4 & 5 銀河賭區賬房1號, 4號及5號 | Remodeling cage counters 拆卸及重裝新設計賬房前台櫃 | May 2015 | Jul 2015 |
Venetian H&M 威尼斯人H&M | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | Mar 2015 | Jun 2015 |
Wynn Tower Roof & Sign 永利酒店天台及招牌 | Wynn Tower Steel Structure Rust Removal & Painting 鋼結構翻新及油漆工程 | Mar 2015 | Oct 2015 |
Galaxy Dock A 銀河卸貨區 | Galaxy Dock A Enhancement work 銀河卸貨區改善工程 | Oct 2013 | Mar 2014 |
Wynn P4 Logistic Storeroom Area 永利P4物流倉庫 | Wynn P4 Logistic Storeroom Area 永利P4物流倉庫裝修工程 | Dec 2014 | Jan 2015 |
Wynn P4 Logistic Storeroom Area 永利P4物流倉庫 | Wynn P4 Logistic Storeroom Area 永利P4物流倉庫裝修工程 | Dec 2014 | Mar 2015 |
Wynn Tower Roof 永利天台 | Wynn Catwalk Repairing 永利天台Catwalk維修工程 | Dec 2014 | Mar 2015 |
Wynn Center Cage 永利帳房 | Wynn Center Cage VIP slots service improvements 永利帳房改善工程 | Dec 2014 | Jan 2015 |
StarWorld L2 Laurel Restaruant VIP Room 星際2樓丹桂軒貴賓房 | StarWorld L2 Laurel Restaruant VIP Room Renovation 星際2樓丹桂軒貴賓房裝修工程 | Nov 2014 | Dec 2014 |
Galaxy MEP Office 銀河機房寫字樓 | Galaxy FRP Enhancement Work to MEP Office 銀河機房寫字樓裝修工程 | Nov 2014 | Jan 2015 |
Galaxy Production Kitchen & Cold food bank 銀河員工餐廳廚房及食物冷凍房 | Galaxy Production Kitchen & Cold food bank upgrade 銀河員工餐廳廚房及食物冷凍房升級工程 | Oct 2014 | May 2015 |
Wynn Macau – Pit 28, 33, 88, Section 10 永利賭廳10, 28, 33, 88 | Misc works 雜項工程 | Aug 2014 | Dec 2015 |
MGM Cotai Mansion 美高梅Mansion | Facade Mock-UP 幕牆實體模擬 | Oct 2014 | Jan 2015 |
Galaxy KFC 5F 銀河光輝寫字樓5樓 | Galaxy KFC 5F Improvement and Maintenance works 銀河翻新及維修工程 | Sep 2014 | Jan 2015 |
Wynn Macau – Gaming Manager Office 永利賭場管理層辦公室 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | July 2014 | Sep 2014 |
Galaxy JWM Training Centre in KHL 銀河JWM培訓中心 (建興龍) | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | July 2014 | Sep 2014 |
COD Poker Room 新濠天地百家樂場 | COD Poker Room Relocation 新濠天地百家樂場搬遷及重建工程 | June 2014 | Aug 2014 |
Wynn Podium Roof 永利天台 | Supply & Installation of Fall Arrest System (phase 3) 供應及安裝第三期防墮系統 | May 2014 | Nov 2014 |
Wynn - Retail 19 永利19號舖 | Demolition to Existing Retail 19 to Shell & Core Works 永利19號舖拆卸及還原工程 | Apr 2014 | Jun 2014 |
Wynn Fall Arrest System (Variation of extra 32 sets) 永利天台防墮系統 (後加32組工程) | Supply and install fall arrest system on roof (Additions) 提供及安裝永利天台防墮系統(後加工程) | Oct 2013 | Mar 2014 |
Wynn – Rolex Shop Front Renovation 永利 – 勞力士錶行裝修工程 | Demolition and fit-out works 清拆及入口櫥窗裝修工程 | Oct 2013 | Nov 2013 |
MGM Cotai Visual Mock Up 美高梅幕牆樣板 | Supply and install visual mock up of external façade for MGM Cotai 提供及安裝美高梅金光大道幕牆1比1樣板 | Mar 2013 | July 2013 |
Wynn Fall Arrest System 永利天台防墮系統 | Supply and install fall arrest system on roof 提供及安裝永利天台防墮系統 | Mar 2013 | July 2013 |
Wynn Macau – Casino Entrance 澳門永利酒店 – 賭場入口 | Demolition and interior fit-out 清拆及室內裝修工程 | 2012 | 2012 |
MGM LT Gaming Fit Out Works 美高梅LT賭區工程 | Interior Fit-Out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
Grand Canal Shoppes Venetian, Shop 2106 威尼斯人2106舖 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
Four Season Shoppes- Unit 2801 威尼斯四季酒店2801舖 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
WYNN MACAU RETAIL - Giorgio Armani 永利酒店店舖 – 喬治•亞曼尼 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
Galaxy Macau Hotel Resort – China Rouge 澳門銀河酒店渡假城 – 紅伶 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
MGM Level 33 Villa 1,3,4,5,6 美高梅酒店 第33層1,2,3,4,5,6 號 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
MGM Additional Fit-out on L01 & L02 美高梅其它翻新工程 | Interior Fit-out 室內裝修 | 2011 | 2011 |
WYNN MACAU ENCORE RETAIL 30A&30B 永利酒店30A&30B舖 | Interior fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
MGM Macau – VIPS Gaming Junket 美高梅酒店 VIPS 賭區 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
MGM Macau – Platinum Gaming Junket 美高梅酒店 VIPS 賭區 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
Comida "Cento Sabores" at Venetian Macau 威尼斯人”Centro Sabores” 舖 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
WYNN MACAU RETAIL - Rolex 永利酒店店舖 – 勞力士 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
Wynn Macau PS-78 永利澳門- PS-78區 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
City of Dreams – House of Dancing Water: Ticketing Box, Entrance Portal and Retail Shop 新濠天地 – 水舞間: 票務大堂,入口大堂及禮品店 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
Venetian Grand Canal Shoppes – Unit 2007a 威尼斯商舖 2007a | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
Venetian Grand Canal Shoppes – Unit 2426 威尼斯商舖 2426 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
City of Dreams - KID CITY 新濠天地 –童夢天地 | Design, Interior Fit-out, Electrical and mechanical works 設計,室內裝修及機電工程 | 2010 | 2010 |
Venetian Macau – Qube 威尼斯人酒店 – 歷險Q立方 | Design, Interior Fit-out, Electrical and mechanical works 設計,室內裝修及機電工程 | 2009 | 2010 |
City of Dreams – Hard Rock Hotel Rooms 新濠天地 – 滾石酒店房口 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2009 | 2009 |
City of Dreams – Bubble Shop 新濠天地 天幕禮品店 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2009 | 2009 |
City of Dreams – Crown Hotel Rooms 新濠天地 – 皇冠酒店房口 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2009 | 2009 |
City of Dreams – Casino Jewelry Shops 1 & 2 新濠天地 – 賭場內珠寶店 1& 2 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2009 | 2009 |
City of Dreams – Hard Rock Hotel Lift Lobby 新濠天地 – 滾石酒店電梯大堂 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2009 | 2009 |
City of Dreams – Crown Hotel Lift Lobby 新濠天地 – 皇冠酒店大堂 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2009 | 2009 |
Four Season Hotels – Hugo Boss 四季酒店商舖 – Hugo Boss | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Venetian Grand Canal Shoppes – Emporio de Gondola 威尼斯人 – 貢多拉手信店 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Four Season Shoppes – Hugo Boss 四季酒店商舖 – Armani Collezioni | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Grand Canal Shoppes, Venetian Macau, Shop 2648 威尼斯人渡假村商舖 - 2648 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Royal Hotel Rooms 皇都酒店房口 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2008 | 2008 |
Venetian Grand Canal Shoppes Optica Unit 1010 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Four seasons Shoppes, (Shop : 2805-2806, 2807) 威尼斯人渡假村四季酒店商舖 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Four seasons Shoppes, Venetian Macau, - 2832 威尼斯人渡假村四季酒店商舖 - 2823 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Four seasons Shoppes, Shop : 1216 威尼斯人渡假村四季酒店商舖 – 1216 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Venetian Macau, Shop : 3013 威尼斯人渡假村商舖-3013 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2008 | 2008 |
Grand Canal Shoppes, Venetian Macau, Shop : 2316 威尼斯人渡假村商舖 – 2316 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2007 | 2007 |
Grand Canal Shoppes, Venetian Macau, Shop : 2013b 威尼斯人渡假村商舖- 2013b | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2007 | 2007 |
Grand Canal Shoppes, Venetian Macau, Shop 2423 威尼斯人渡假村商舖- 2423 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2007 | 2007 |
Grand Canal Shoppes, Venetian Macau, Shop 2120 威尼斯人渡假村商舖- 2120 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2007 | 2007 |
Grand Canal Shoppes, Venetian Macau, Shop 2022, 2103 威尼斯人渡假村商舖 –2022&2103 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2007 | 2007 |
Warning: Use of undefined constant pagination - assumed 'pagination' (this will throw an Error in a future version of PHP) in /home/customer/www/grandflag.com/public_html/wp-content/themes/retlehs-roots-f0db29b/functions.php on line 93
Project Name 工程名稱 | Scope of work 內容 | Start 開始工期 | End 完成工期 |
---|---|---|---|
Restaurant Renovation 德乒衛日本餐廳裝修工程 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | Apr 2015 | Ongoing |
Duckling Restaurant Renovation 德仔記海鮮火鍋裝修工程 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | Nov 2013 | July 2014 |
海蘭花園室內裝修工程 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | Jul 2013 | Oct 2013 |
Grand Flag New Office 君祺工程有限公司 - 新辦公室 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | Jul 2013 | Aug 2013 |
Macau Chinese Opera Association Office & Club House 澳門粵曲總會 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | Dec 2012 | April 2013 |
Coloane Rua de Hac Sa Long Chao Kok no. 288 & 502 澳門路環黑沙龍爪角海濱路288及502號發展項目 | Demolition a & Building Construction 拆卸及建築工程 | 2012 | 2012 |
Duckling Restaurant (Taipa) Renovation 氹仔德仔記裝修工程 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | 2011 | 2011 |
Golden Jaguar International Seafood Restaurant 金錢豹國際海鮮酒家 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
JARDINS DO OCEANO, TAIPA (EDEL WEISS COURT) 氹仔海洋花園慧苑17樓工程 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
EDO Japanese Restaurant at shop 236-238 One Central 壹號湖畔EDO日本料理 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | 2011 | 2011 |
PORSCHE SHOWROOM-MACAU 財富中心保持捷 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2011 | 2011 |
Restaurant Renovation 暹邏泰國餐廳裝修工程 | Design, Interior Fit-out, Electrical and mechanical works 室內設計、裝修及機電工程 | 2010 | 2010 |
Childhood Nursery 童真托兒所裝修工程 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
Central DELI - One Central Macau shop 222 壹號湖畔商鋪222 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
Commercial Laundry Factory Parque Industrial Da Concordia 路環聯生工業村中央洗衣房工程 | MVAC System | 2008 | 2008 |
New Government Office in Edf. Banco Luso International 國際銀行大廈26樓政府新辦公室 | MVAC System | 2008 | 2008 |
Construction of Colegio De St. Rosa De Lima(SC) 聖羅撒女子中學中文部總承包工程 | MVAC System | 2008 | 2008 |
Taipa Business Bank Macau Branch 氹仔中小企業銀行澳門分行 | MVAC System | 2007 | 2007 |
Warning: Use of undefined constant pagination - assumed 'pagination' (this will throw an Error in a future version of PHP) in /home/customer/www/grandflag.com/public_html/wp-content/themes/retlehs-roots-f0db29b/functions.php on line 93
Project Name 工程名稱 | Scope of work 內容 | End 完成工期 | End 完成工期 |
---|---|---|---|
New Legislative Council Building 澳門立法會大樓全層會議廳 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2012 | 2012 |
Direcção dos Serviços de Correios 郵政局 | MVAC System 設置鮮風系統 | 2010 | 2010 |
CONSERVATÓRIA DO REGISTO CIVIL DE MACAU 海島公證署、民事登記局 | MVAC System 設置鮮風系統 | 2010 | 2010 |
Macau Water Customer Service Center 澳門自來水客服中心 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2010 | 2010 |
Macau East Asian Stadium 澳門東亞運動會體育館 | MVAC System 設置鮮風系統 | 2010 | 2010 |
YMCA 女青少年短期宿舍 | MVAC System. 設置鮮風系統 | 2009 | 2010 |
Instituto Politecnico de Macau attic 澳門理工學院閣樓 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2009 | 2010 |
Cultural Center Building, negative 2nd floor office and lounge 文化中心大樓負2層辦公室及休息室 | Renovation, Electrical and mechanical works 翻新及機電工程 | 2009 | 2009 |
Obras de instalacao do sistema de ventilacao das Piscinas do Carmo 體育綜合體泳池區 | MVAC System 設置鮮風系統 | 2009 | 2009 |
Estacionamento Subterrãneo Junto Ao Terminal Maritimo Da Taipa 臨近氹仔新碼頭的地下停車場 | VRV System VRV系統安裝 | 2009 | 2009 |
The Olympic complex multi-storey car park offices of demo room 奧林匹克綜合體多層停車場辦公室設置演示室 | VRV System VRV系統安裝 | 2009 | 2009 |
Universidade De Macau Extension and alteration Project 澳門大學蔡繼有樓擴建及更改工程 | Interior Fit-out, Electrical and mechanical works 室內裝修及機電工程 | 2009 | 2009 |
Edifficio da Nova Sede da Assembleia Legislativa 新立法會大樓 | MVAC System. 設置鮮風系統 | 2009 | 2009 |
Instituto de Accao Social 社會工作局 扶康會怡樂軒 | MVAC System. 設置鮮風系統 | 2009 | 2009 |
Pavilhão Polidesportivo Tap Seac 塔石體育館 | MVAC System. 設置鮮風系統 | 2009 | 2009 |
Complexo Desportivo do Colégio D. Bosco 鮑思高體育綜合體育館 | MVAC System. 設置鮮風系統 | 2009 | 2009 |
Amaral e Acessos 亞馬喇前地停車場 | MVAC System Maintenance 設置鮮風系統保養工程 | 2008 | 2010 |
Director da Escola de Polícia Judiciária (E.P.J.) 司法警察學校 | MVAC System Maintenance 設置鮮風系統保養工程 | 2008 | 2010 |
Novas Instalações do Conselho do Ambiente 皇朝十樓環境委員會 | MVAC System. 設置鮮風系統 | 2008 | 2009 |
Edifficio da Nova Sede da Assembleia Legislativa-Obras de Melhoramento Nov2008 新立法會大樓 | MVAC System. 設置鮮風系統 | 2008 | 2009 |
China Plaza 17/F- Gabinete Para os Assuntos do Direito Internacional 中華廣場17樓國際法事務辦公室 | MVAC System. 設置鮮風系統 | 2008 | 2008 |
The terminal computer room of Edifício Administração Pública 行政暨公職局25樓電腦終端機房 | MVAC System. 設置鮮風系統 | 2007 | 2007 |
Edifício Administração Pública 9/F 公共行政福利基金位於公共行政大樓9樓 | MVAC System. 設置鮮風系統 | 2007 | 2007 |
Obra de " New Office of Transport Department of DSSOPT " 土地工務運輸局運輸廳新辦公室 | MVAC System. 設置鮮風系統 | 2007 | 2007 |
Dismantling Project - Edifício Administração Pública, 14F 澳門水坑尾街162號公共行政大樓14樓 | MVAC System. 設置鮮風系統 | 2007 | 2007 |
Warning: Use of undefined constant pagination - assumed 'pagination' (this will throw an Error in a future version of PHP) in /home/customer/www/grandflag.com/public_html/wp-content/themes/retlehs-roots-f0db29b/functions.php on line 93
Project Name 工程名稱 | Scope of work 內容 | Start 開始工期 | End 完成工期 |